Grading and Site Preparation

Grading & Pad Site Prep in Dallas

Flat, compacted, drained, and ready to pour. Inspection-ready pad sites for builders, contractors, and owners across North DFW.

What a pad site actually needs

Flat within tolerance. Compacted to the right proof. Drained away from the slab on all four sides. Built over stable soil, or over fill that's been placed, moisture-conditioned, and rolled in lifts. Skipping any of that is how you get cracked slabs, warranty callbacks, and insurance claims three years later.

How we build pads

Strip topsoil, undercut to competent subgrade, proof-roll, place select fill in six to eight inch lifts, compact each lift, final grade to spec. On the day before the pour we fine-grade and shoot grade one more time to catch anything that settled.

Drainage built in

Every pad we build has positive drainage fall off the slab on all sides, typically a quarter-inch per foot minimum for the first ten feet. If the natural grade doesn't cooperate, we build in swales or French drains during grading, not after. Water that can't leave the slab becomes a foundation problem fast in blackland clay.

Builder-friendly scheduling

Pads hate weather. We schedule around forecast, protect finished grade with plastic when needed, and coordinate with your concrete crew so the pad isn't sitting exposed for weeks. Straight communication the whole way.

Grading & Pad Sites: common questions.

The stuff we get asked most. If yours isn't here, email us.

Yes. Send the plans and we'll quote to the spec: lift thickness, compaction requirement, proof-roll, the whole package. Independent density testing is coordinated with whichever lab you prefer.
A standard custom-home pad cut, fill, and grade runs one to three days once we're on-site. Bigger commercial pads or those with significant fill take longer. Weather is usually the biggest variable.
Yes. Driveway cuts, crown grading, base rock, and gravel top-off on rural and rural-residential drives. We also build and repair gravel ranch roads across North Texas.

Pad site ready when you need it

We grade to the engineer's spec and time it around your concrete pour.